Creation of a link road in the county of Biberach a. d. Riss/Germany

Location: Winterreute - Hagenbuch
Surface: approx. 6.000 m²
Carried out: May 2009
Time needed: 3 days
Concrete: 180 kg/m³ InfraCrete cement mixture
Milling depth: 30 cm


Creation of a highly frequented access road to a quary with used tarry road construction material

Location: Zimmern ob Rottweil/Germany
Surface: 5.000 m²
Carried out: March 2009
Time needed: 2 days
Concrete: 180 kg/m³ Strength of layer: 15 cm
Grain size: 0 – 32 mm
Additional water: 7%


Creation of a link road between Glina and Topusco/Croatia

Surface: approx. 12 km
Carried out: April/May 2009
Time needed: ca. 8 weeks
Concrete: 180 kg/m³
Milling depth: 30 cm


Creation of the exterior area of a logistics centre for the Army of Sweden

Location: Arboga/Sweden
Surface: approx. 90.000 m2
Carried out: June/July 2009
Time needed: ca. 8 weeks
Concrete: 180 kg/m³
Milling depth: 30 cm


Creation of an operating road for the construction of the new ThyssenKrupp steel mill in Brazil

Location: Santa Cruz (Rio de Janeiro)
Area: 8.000 m² (testing area, first section)
Carried out: July 2008
Time needed: 1 week
Concrete: 190 kg/m³ InfraCrete-cement-mixture
Milling depth: 40 cm


Creation of a concrete area without reinforcement for heavy load traffic

Location: Empfingen (Germany)
Area: 2.000 m²
Carried out: February 2008
Time needed: 1 day
Concrete: 170 kg/m³ InfraCrete-concrete-mixture
Strenght of layer: 18 cm

Creation of a link road in the county of Biberach a. d. Riss/Germany
Creation of a highly frequented access road to a quary with used tarry road construction material
Creation of a link road between Glina and Topusco/Croatia
Creation of the exterior area of a logistics centre for the Army of Sweden
Creation of an operating road for the construction of the new ThyssenKrupp steel mill in Brazil
Creation of a concrete area without reinforcement for heavy load traffic